Prime cost is your cost of sales plus your total labour cost. Divide it by sales before VAT to get your prime cost percentage. Most guides put a healthy figure at 55% to 65% of sales. It is the largest cost you control, so it is the number to watch every week.
What is prime cost, and how do you calculate it?
Prime cost puts your two largest controllable costs in one figure. A lease fixes your rent. Food and labour move every week with the decisions your team makes.
- Prime cost = cost of sales + labour cost.
- Prime cost % = prime cost ÷ sales before VAT × 100.
Cost of sales is what the food, drink and packaging you sold cost: opening stock plus purchases minus closing stock. Our guide to the food cost percentage formula covers that half. Labour is everything you pay to have people working, not only salaries.
What counts as labour cost in a UAE café or restaurant?
Guides written for other markets list payroll taxes and benefits. A UAE payroll carries different costs, and many of them sit outside the monthly salary. Count all of these:
- Basic salary and every allowance, such as housing and transport.
- Overtime and public holiday pay for the month.
- The end-of-service gratuity that builds up each month, even though you pay it later.
- The annual leave your staff earn, valued at what you will pay for it.
- Visa, Emirates ID and medical insurance costs, spread over the months they cover.
- Accommodation, transport and staff meals, if you provide them.
- Part-time, agency and freelance staff.
The accruals matter most. Leave them out and labour looks cheaper every month, until one resignation lands a large bill in a single month. The employee cost calculator shows what one person costs beyond the wage.
Decide once whether managers' pay goes in, and keep the rule. Most operators count everyone who works in the branch, the manager included.
What does prime cost look like in a worked example?
An invented branch in the Marina, selling cups, coffee bags and food. All figures are in AED, before VAT:
| Line | September | October |
|---|---|---|
| Sales | 394,400 | 412,600 |
| Cost of sales | 134,096 | 144,410 |
| Staff | 96,750 | 103,150 |
| Prime cost | 230,846 | 247,560 |
| Prime cost % | 58.5% | 60.0% |
| Left after prime cost | 163,554 | 165,040 |
Sales rose AED 18,200, but prime cost rose 16,714. That left only 1,486 more to pay rent, utilities and everything else.
The two halves explain it. Food cost moved from 34% to 35% of sales: 1,440 from a 20% rise in oat milk, and 2,686 from an offer. Staff cost rose 6,400, all of it overtime, while sales grew 4.6%.
After rent of 57,800, utilities and other costs of 41,260 and waste of 4,120, October kept 61,860. That is 1,514 less than September, on higher sales.
What is a good prime cost percentage?
There is no official figure. Most restaurant guides quote 55% to 65% of sales, with full-service restaurants near the top of that range. Treat it as a starting point.
A café splits it differently. Espresso and milk drinks run a low food cost, often 10% to 25%, so more of the room goes to staff. A restaurant with a full kitchen runs a higher food cost and needs tighter staffing to stay in the same range.
Two checks matter more than the benchmark:
- Your own trend. A rise of one or two points that lasts a month is real money. At the Marina branch, 1.5 points is about AED 6,200 a month.
- What is left. Prime cost has to leave enough for rent, fixed costs and a profit. A branch with high rent needs a lower prime cost than one with low rent.
How do you track prime cost every week?
- Count stock at the same hour each week, so cost of sales covers the same days as sales.
- Take sales from the till before VAT, for exactly those days.
- Spread monthly salaries and accruals by day: monthly cost ÷ days in the month × 7.
- Add the week's actual overtime, part-time hours and agency invoices.
- Write each branch's prime cost % beside last week's and the same week last month.
Keep waste in the same place every week. In the example above, waste sits on its own line. Put it into cost of sales and October's prime cost reads 61.0%. Either works if it never changes.
A weekly figure catches a drift in its first week. A monthly figure reports it after the month has closed.
How do you bring prime cost down?
Start with the largest line that moved, not with a general cut. In the example, the oat milk rise and the overtime come to AED 7,840 a month. Getting both back brings October to 58.1%.
- Supplier prices. Check each bill against the agreed price, and reprice an item when its cost stays up.
- Portions and recipes. Weigh doses and pours, and keep recipe costs current.
- Waste and unrecorded use. Record waste with a reason, and staff drinks as internal use.
- Rosters. Staff the hours by sales, hour by hour. Overtime often points to a gap in the roster, not a busy month.
- Offers. Cost an offer before it runs, and check what it left after.
Don't cut what customers notice. A smaller portion or a short-staffed rush can cost more in lost sales than it saves.
What is the next step?
Work out last month's prime cost for each branch, with every labour cost in. Then work it out each week for a month, and see which half moves.
In Seyaqi, till sales take their recipes out of stock at current cost, and payroll, overtime and the gratuity you owe post to the books by themselves. The profit and loss for each branch shows both halves of prime cost the same day. See how it works.
Common questions
What is the prime cost formula?
Prime cost is cost of sales plus labour cost. Divide it by sales before VAT and multiply by 100 to get prime cost percentage.
What is included in labour cost for prime cost?
Salaries and allowances, overtime, and part-time and agency staff. In the UAE, also count the gratuity and leave that build up each month, and visa, Emirates ID and medical insurance costs spread over the months they cover.
What is a good prime cost percentage for a restaurant?
Most guides quote 55% to 65% of sales. Your own trend, and what is left for rent and profit, matter more than the benchmark.
Is rent part of prime cost?
No. Rent, utilities and other fixed costs come out of what is left after prime cost.
Every number in your business, in context.
Seyaqi runs stock, production, purchasing, sales, people and the books in one system, with an AI Advisor that reads it all every night and tells you what needs you.
Read next
- Finance Aged receivables report: how to read it and collect What the age columns tell you, and a weekly routine that turns overdue invoices into cash. 4 min read
- Finance Petty cash procedure for a small business, step by step A fixed float, one holder, a receipt for everything and a count every week, with a worked example and the VAT rule for receipts. 5 min read
- Finance Month-end close checklist for a small business in the UAE Eight steps in order, who does each one, and why the close only drags when the books fall behind during the month. 6 min read